Ajayi, S O, Oyedele, L O, Kadiri, K O, Akinade, O O, Bilal, M, Owolabi, H A and Alaka, H A (2016) Competency-based measures for designing out construction waste: Task and contextual attributes. Engineering, Construction and Architectural Management, 23(04), 464-90.

Carbonara, N, Costantino, N and Pellegrino, R (2016) A transaction costs-based model to choose PPP procurement procedures. Engineering, Construction and Architectural Management, 23(04), 491-510.

Ho, P H K (2016) Labour and skill shortages in Hong Kong’s construction industry. Engineering, Construction and Architectural Management, 23(04), 533-50.

Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(04), 428-47.

Lu, W, Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(04), 448-63.

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(04), 511-32.

  • Type: Journal Article
  • Keywords: Australia; infrastructure; cost efficiency; collaborative projects; client characteristics; time efficiency
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-06-2015-0084
  • Abstract:
    Purpose - Collaboration is thought to offer significant benefits over traditional contracts, however there is little existing research concerning how these benefits can be optimized. To address this gap, a survey investigated the impact of client characteristics on the time and cost efficiency of collaborative infrastructure projects. The paper aims to discuss these issues. Design/methodology/approach - The survey of experienced senior practitioners of Australian collaborative infrastructure projects yielded 320 valid responses. Cluster analysis, one-way between group ANOVA tests and independent sample t-tests were used to confirm that three client characteristics are critical to time and cost performance: client sector (public/private); client experience with asset procurement; and client approach to price competition. Findings - Projects procured by experienced private sector clients were found to meet targeted levels of performance, regardless of their approach to team selection. Among projects procured by experienced public sector clients, groups of relatively low and high performing projects could be distinguished, regardless of their approach to team selection. Projects run by teams selected competitively on non-price criteria prior to the pricing stage exhibited significantly better performance than those run by teams that competed on the price of the project to win the work. Research limitations/implications - This study focussed only on analysis of three client characteristics. Future research may consider a broader range of contextual variables. Results are based on perceptual data rather than objective data. Practical implications - The findings show collaborative infrastructure clients in the construction sector should be less concerned about inexperience than they might have been, and more interested in single-team selection approaches than they might have been. Originality/value - The results indicate significant performance differences between client types. In particular, experienced public sector clients had more polarized performance outcomes, compared to the private sector.

Upstill-Goddard, J, Glass, J, Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(04), 407-27.